Plumbing and Drainage Restoration at The Globe, Moorgate – Mitchells & Butlers

Project Snapshot

Client Mitchells & Butlers
Sector Hospitality
Location The Globe, 83 Moorgate, London EC2M 6SA
Services Plumbing pipework replacement, drainage clearance, descaling
Duration 1 day (Sunday)
Challenge Inaccessible defective pipework in a ceiling void causing leaks and flooding, venue only available on Sundays

Overview

The Globe in Moorgate had just come through a five-week refurbishment. Almost immediately, the newly finished venue had a problem: the pipework serving the upstairs toilets was failing, and it was hidden in a ceiling void that nobody could easily get to.

The blockages were causing leaks at push-fit joints. Water was getting into the upstairs bar area and dripping to the floor below. For a pub in the City of London that trades six days a week, the cost of closing for repairs, or worse, leaving the problem unresolved, was out of the question.

LDF deployed three experienced plumbers on a Sunday, coordinated with the building contractor, and had the job done before the venue needed to reopen. One day. No revenue lost. Problem solved.

The Challenge

The pipework serving the upstairs toilets at The Globe had developed severe bellying, where sections of pipe sag and create low points, along with significant internal scale build-up over time. The combination meant chronic blockages, and those blockages were causing backpressure that pushed water out through the push-fit joints connecting sections of pipe.

The result was water appearing in two places it shouldn’t: leaking into the upstairs bar area, and dripping through to the floor below.

The complicating factor was access. The pipework ran entirely through a ceiling void, concealed behind finished surfaces and service boxing. Getting to it required partial removal of the ceiling structure, which meant coordinating with the building contractor who had carried out the recent refurbishment.

Annotated ceiling view of The Globe, Moorgate, showing drainage pipe routes identified during CCTV survey
Ceiling void at The Globe, Moorgate, with drainage pipe routes annotated following CCTV survey

And the venue only closed on Sundays. That gave LDF one day.

Our Approach

Three LDF plumbers attended on a Sunday morning, working in close coordination with the client’s building contractor, who was on site to assist with ceiling access.

The team carefully removed sections of ceiling and service boxing to expose the defective pipework, methodically, to avoid unnecessary damage to the finished surfaces surrounding the void. Once accessible, the failed pipework was removed completely.

Ceiling void in The Globe, Moorgate, showing aging drainage pipework with annotated fault location
Ceiling void above the venue, revealing defective pipework with annotated fault location

In its place, the team installed robust solvent-weld pipework, a significantly more durable solution than the push-fit system it replaced, and one that eliminates the joint-leak risk entirely. The new pipework was securely bracketed and braced throughout to prevent future sagging and the belly formation that had caused the original blockages.

Ceiling inspection at The Globe, Moorgate, revealing twin drainage pipes on brackets above open ceiling joists during drainage works
Newly installed drainage pipework, correctly bracketed and braced within the ceiling void

With the defective sections replaced, the team then descaled the existing pipework that remained in the system, restoring free-flowing drainage throughout.

Finally, in collaboration with the building contractor, the team installed accessible service points at key locations throughout the newly upgraded system. This means that if maintenance or inspection is needed in the future, it can be carried out without repeating the ceiling removal, a practical, long-term improvement to the system’s serviceability.

All works were completed within the one-day window, with the building contractor reinstating ceiling sections before the venue reopened.

The Outcome

The Globe’s pipework issues were fully resolved in a single Sunday. No leaks, no flooding to the floors below, and no interruption to trading. The replacement pipework is more durable than the original system and correctly supported to prevent the sagging that caused the problem in the first place. Accessible service points are now in place for future maintenance.

For a recently refurbished venue in one of London’s busiest commercial districts, the outcome is exactly what the client needed: a permanent fix delivered on the only day it was possible, without the disruption that a multi-day closure would have caused.

About This Project Type

Concealed pipework failures in commercial hospitality settings are common, ceiling voids, service risers, and back-of-house drainage systems are often inaccessible without careful structural access, and they’re rarely identified until blockages become leaks. Working within a single Sunday window required precise coordination between LDF’s plumbers and the building contractor, with ceiling reinstatement completed before the venue opened.

The accessible service points installed as part of this project are a practical improvement beyond the scope of the original repair, they allow future inspection and maintenance without repeating the ceiling removal.

LDF works with hospitality operators on reactive call-outs, plumbing repairs, drainage clearance, and planned maintenance programmes. For multi-site portfolios, PPM contracts are available across all sites.

Work with LDF

Call our 24-hour helpline: 0800 612 2179
Or visit: london-drainage.com/commercial/

Some images on this page have been digitally enhanced to improve resolution.

Sheerness Dockyard Church tower amongst trees and buildings on sunny winter day

Drainage Survey and No-Dig Lining Repairs at Sheerness Dockyard Church for Coniston Ltd

Project Snapshot Client Coniston Ltd Sector Construction Location Sheerness Dockyard Church, Isle of Sheppey, Kent Services CCTV drain survey, high-pressure jetting, resin patching, drain lining Duration 1 month Challenge Defective drainage discovered during survey at a listed building under a £4.2m National Lottery Heritage Fund restoration, requiring no-dig repair across 120 metres of pipework Overview...Continue reading

Red London bus parked in Mayfair, London

Commercial Drainage Installation at 28 Bolton Street, Mayfair

Project Snapshot Client MWA Ltd Sector FM & Property Location 28 Bolton Street, London W1J 8BP Services Excavation, drainage installation, foul sewer connection, surface water drainage Duration 5 days Challenge Redundant lower ground floor required a complete new drainage system capable of handling wastewater volumes from three floors above Overview A commercial office building in...Continue reading

Underslab drainage CCTV survey at Global Life Sciences facility, Amersham Place, Little Chalfont

Underslab Drainage Rehabilitation at a Life Sciences Facility, Amersham Place

Project Snapshot Client Global Life Sciences Solutions Operations UK Ltd Sector FM & Property Location Amersham Place, Little Chalfont, HP7 9NA Services CCTV drain survey, Picote cleaning and descaling, root cutting, drain lining and patching, confined space inspection, excavation and pipework replacement Duration 20 days Challenge Full underslab drainage network across a live operational facility...Continue reading

New soil stack installation at Lewisham Park Towers residential regeneration project

Soil Stack Installation and Underground Drainage at Lewisham Park Towers

Project Snapshot Client Axis on behalf of L&Q (London and quadrant) Sector Construction Location Lewisham Park Towers, London Services Soil stack installation, underground drainage, site welfare drainage connections Duration 2 years (4 phases) Value Approx. £800k (drainage scope) Challenge Full soil stack replacement across three occupied towers, coordinating drainage works with cladding and internal refurbishment...Continue reading

Rehabilitation of Underslab Drainage System at Amersham Place

Client Overview: Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business. Background: The underslab drainage system at the Amersham Place facility required urgent attention due to...Continue reading

Repair Work to Sheerness Dockyard Church on behalf of Coniston Ltd

Sector: Construction Client: Coniston Ltd Project Location: Sheerness Dockyard Church Duration of project: 1 month London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent. Challenge The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the...Continue reading

London Drainage Facilities van seen by the House of Commons in London

Tanker and Wet Vac Services to Clear House of Commons Flood

Project Snapshot Client House of Commons, Palace of Westminster Sector Government / Facilities Management Location Palace of Westminster, London SW1A 0AA Services Vacuum tanker works, wet vac flood clearance Duration 1 week Challenge Flash flooding across multiple rooms in a Grade I listed, active government building Overview When flash flooding struck the Palace of Westminster...Continue reading