Rehabilitation of Underslab Drainage System at Amersham Place

Rehabilitation of Underslab Drainage System at Amersham Place

Client Overview:

Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business.

Background:

The underslab drainage system at the Amersham Place facility required urgent attention due to various issues affecting its functionality. To address this, the client engaged our team of professionals to conduct a comprehensive CCTV survey of the drainage system to identify any underlying problems.

Scope of Work:

London Drainage Facilities commenced the project by conducting a thorough CCTV survey of all accessible underslab drainage across the site. This involved deploying specialised equipment and trained personnel to inspect the entire drainage network for any defects, blockages, or damages.

Rehabilitation of Underslab Drainage System at Amersham Place

Upon completion of the survey, it was evident that extensive repair works were necessary to restore the drainage system to its original state. The identified issues included the need for lining, patching, cleaning/descaling and root cutting.

The repair process involved the following steps:

Cleaning/Descaling and Root Cutting: Utilising specialist Picote machinery, the team conducted cleaning, descaling and root cutting operations to prepare the pipes for repair.

Lining and Patching: Extensive lining and patching works were carried out on sections of the drainage system, involving the application of 100mm and 150mm lining and patching materials.

CCTV Inspection: For pipework sized at 225mm, a specialist Crawler Unit and a trained 3-man team equipped with confined space equipment were deployed to conduct CCTV inspections to ensure the integrity of the repaired sections.

Excavation and Replacement: In instances where sections of pipework were collapsed beyond repair, excavation works were undertaken by specialist teams. The damaged sections were replaced with BS-approved equivalents and backfilled to match the existing surface area.

Post-Repair Survey: Following the completion of all repair works, a comprehensive re-survey of all sections of pipework was conducted to verify that the repairs were executed correctly and to ensure the overall integrity of the drainage system.

Challenges:

Local drainage company in London

Several challenges were encountered throughout the project, including the need for specialised equipment, confined space requirements for certain inspection tasks, and the complexity of the repair works due to the extent of damage to the drainage system.

Outcomes:

Despite the challenges faced, London Drainage Facilities successfully completed the rehabilitation of the underslab drainage system at Amersham Place. The repaired system now functions efficiently, ensuring uninterrupted operations at the client’s facility and mitigating the risk of future drainage issues.

Conclusion:

The project exemplifies London Drainage Facilities’ expertise in providing comprehensive drainage solutions, addressing complex issues with precision and efficiency. By successfully restoring the underslab drainage system, the project has contributed to the seamless operation of the client’s facility and has enhanced its infrastructure resilience.

Lewisham Park Towers

Project Overview: Lewisham Park Towers is undergoing a comprehensive regeneration project aimed at enhancing the infrastructure and living conditions within the site. The project encompasses three towers, involving the complete replacement of exterior cladding, internal refurbishments of kitchens and bathrooms, and the relocation of soil stacks. The scope of work also includes the installation of...Continue reading

Repair Work to Sheerness Dockyard Church on behalf of Coniston Ltd

Sector: Construction Client: Coniston Ltd Project Location: Sheerness Dockyard Church Duration of project: 1 month London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent. Challenge The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the...Continue reading

London Drainage Facilities van seen by the House of Commons in London

Tanker and Wet Vac Services to Clear House of Commons Flood

Project Snapshot Client House of Commons, Palace of Westminster Sector Government / Facilities Management Location Palace of Westminster, London SW1A 0AA Services Vacuum tanker works, wet vac flood clearance Duration 1 week Challenge Flash flooding across multiple rooms in a Grade I listed, active government building Overview When flash flooding struck the Palace of Westminster...Continue reading

Emergency A&E Restoration at Newham General Hospital

Project Snapshot Client KRH Contracts Ltd (on behalf of Newham General Hospital) Sector Healthcare / Facilities Management Location Newham General Hospital, Glen Road, London E13 8RU Services Vacuum tanker works, wet vac flood clearance, high-pressure drain jetting Duration 1 night Overview On a weekend in late July 2021, a flash flood forced Newham General Hospital...Continue reading

Picote Concrete Removal at Heathrow Airport for BAM Nuttall Ltd

Project Snapshot Client BAM Nuttall Ltd Sector Aviation / Construction Location Heathrow Airport Tunnels, London Services Picote concrete removal, CCTV drain surveying, high-pressure jetting Duration 1 month Challenge Hardened concrete blockages in live airport tunnel drainage, excavation impossible Overview When BAM Nuttall’s drainage investigation at Heathrow Airport uncovered hardened concrete blocking the tunnel drainage system,...Continue reading

Tree Root Removal Services for Storm Group

Sector: Public (Council owned day care)Client: Storm GroupProject Location: Lion and Hogarth Centre, BrentwoodDuration of project: 3 weeksLondon Drainage Facilities were approached by Storm Group to offer vital support for their project at the Lion and Hogarth Centre in Brentwood.ChallengeThe Lion and Hogarth Centre is a council-owned day centre for older people, providing care and...Continue reading