Client Name: Mitchells & Butlers
Project Location: The Globe, 83 Moorgate, London EC2M 6SA
Duration of Project: 1 day (Sunday)
Sector: Hospitality
Service Provided: Plumbing pipework replacement and drainage clearance
Challenge:
The pipework serving the upstairs toilets was located within a ceiling void, making it completely inaccessible. Over time, the system had developed severe bellies and internal scale build-up, resulting in frequent blockages. These blockages caused leaks at the push-fit joints, leading to flooding in both the upstairs bar area and the floor below. The urgency was compounded by the fact that the venue had recently undergone an extensive five-week refurbishment, making it critical to deliver a fast, minimally disruptive solution.
Solution:
With the pub only closed on Sundays, our team deployed three experienced plumbers to work in coordination with the client’s building contractor. Together, they carefully removed sections of ceiling and service boxing to access the defective pipework.
Once exposed, the team swiftly removed the failed pipework and installed robust, solvent-weld pipework, securely braced to prevent future sagging or movement. The remaining existing pipework was then thoroughly descaled to restore free-flowing drainage.
To futureproof the system and support easier maintenance, we collaborated with the building contractor to install accessible service points throughout the newly upgraded drainage system.
Client Name: Mitchells & Butlers Project Location: The Navigation Inn, 4 Wharf Road, Enfield, EN3 4XX Duration of Project: 2 months Sector: Hospitality Service Provided: Excavation and installation of new drainage system Challenge: The Navigation Inn’s proximity to the River Lee makes it highly susceptible to flooding, particularly during periods of heavy rainfall. The surrounding...Continue reading→
Location: 28 Bolton St, London, W1 8BP Project Dates: 1st July 2024 to 5th July 2024 Project Overview: This project entailed the installation of a new drainage system for a lower ground office building situated in central London. The three-story building has a total floor area of approximately 6,000 square meters. The lower ground floor,...Continue reading→
Client Overview: Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business. Background: The underslab drainage system at the Amersham Place facility required urgent attention due to...Continue reading→
Project Overview: Lewisham Park Towers is undergoing a comprehensive regeneration project aimed at enhancing the infrastructure and living conditions within the site. The project encompasses three towers, involving the complete replacement of exterior cladding, internal refurbishments of kitchens and bathrooms, and the relocation of soil stacks. The scope of work also includes the installation of...Continue reading→
Sector: Construction Client: Coniston Ltd Project Location: Sheerness Dockyard Church Duration of project: 1 month London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent. Challenge The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the...Continue reading→
Sector: Facilities Management Client: House of Commons Project Location: House of Commons, Palace of Westminster Duration of project: 1 week London Drainage Facilities responded to a flash flooding emergency at the House of Commons, following a prolonged stretch of downpours and storms. We provided tanker and wet vacs services to clear the flood and restore this high-profile...Continue reading→
Sector: Facilities Management Client: KRH Contracts Ltd Project Location: Newham General Hospital, Glen Road, London, E13 8RU Duration of project: 1 night When extreme weather hits the UK, this can be damaging and chaotic for public services. London Drainage Facilities were contacted after Newham General Hospital in East London was forced to close its busy A&E department due...Continue reading→
Sector: Commercial Client: BAM Nuttall Ltd Project Location: Heathrow Airport Tunnels Duration of project: 1 month London Drainage Facilities were delighted to win the tender for a ground-breaking project at Heathrow Airport. Our client, BAM Nuttall Ltd, had been working there since 2014, upgrading the main tunnel into the Heathrow central terminal area. The client...Continue reading→
Sector: Public (Council owned day care)Client: Storm GroupProject Location: Lion and Hogarth Centre, BrentwoodDuration of project: 3 weeksLondon Drainage Facilities were approached by Storm Group to offer vital support for their project at the Lion and Hogarth Centre in Brentwood.ChallengeThe Lion and Hogarth Centre is a council-owned day centre for older people, providing care and...Continue reading→