Project Overview:

Lewisham Park Towers is undergoing a comprehensive regeneration project aimed at enhancing the infrastructure and living conditions within the site. The project encompasses three towers, involving the complete replacement of exterior cladding, internal refurbishments of kitchens and bathrooms, and the relocation of soil stacks. The scope of work also includes the installation of new soil stacks spanning the entire height of the towers and connecting each property to underground drainage.

Project Phases:

The regeneration project is structured into four distinct phases spanning a period of two years:

Phase 1 (Completed March ’24):

This phase focused on laying the groundwork by installing the bases of the stacks and connecting them to the main underground drainage system.

Phase 2 (Summer of ’24):

During this phase, brackets and fixings were installed throughout the height of the towers in preparation for stack installation. Concurrently, Clait, a contracted company, commenced the installation of cladding around the brackets and fixings.

Phase 3 (Early ’25):

The main objective of this phase is the installation of stacks spanning the entire height of the towers, with connections prepared for individual property hook-ups.

Phase 4:

The final phase involves transitioning properties to the new stacks and capping off the existing ones, ensuring a seamless switch to the upgraded infrastructure.

Additional Installations:

In addition to the core regeneration works, three new installations were carried out to facilitate temporary site welfare services. These installations included pipework preparation for connection by plumbing contractors.

Project Cost:

The drainage works associated with the project amounted to approximately £800k, indicating the scale and investment required for the successful execution of the regeneration endeavour.

Outcome:

The Lewisham Park Towers regeneration project represents a significant undertaking aimed at revitalising the infrastructure and living spaces within the site. Through meticulous planning and execution across multiple phases, the project aims to deliver enhanced amenities and improved living standards for residents over the coming years.

 

Rehabilitation of Underslab Drainage System at Amersham Place

Client Overview: Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business. Background: The underslab drainage system at the Amersham Place facility required urgent attention due to...Continue reading

Repair Work to Sheerness Dockyard Church on behalf of Coniston Ltd

Sector: Construction Client: Coniston Ltd Project Location: Sheerness Dockyard Church Duration of project: 1 month London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent. Challenge The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the...Continue reading

Tanker and Wet Vac Services to Clear House of Commons Flood

Project Snapshot Client House of Commons, Palace of Westminster Sector Government / Facilities Management Location Palace of Westminster, London SW1A 0AA Services Vacuum tanker works, wet vac flood clearance Duration 1 week Challenge Flash flooding across multiple rooms in a Grade I listed, active government building Overview When flash flooding struck the Palace of Westminster...Continue reading

Emergency A&E Restoration at Newham General Hospital

Project Snapshot Client KRH Contracts Ltd (on behalf of Newham General Hospital) Sector Healthcare / Facilities Management Location Newham General Hospital, Glen Road, London E13 8RU Services Vacuum tanker works, wet vac flood clearance, high-pressure drain jetting Duration 1 night Overview On a weekend in late July 2021, a flash flood forced Newham General Hospital...Continue reading

Picote Concrete Removal at Heathrow Airport for BAM Nuttall Ltd

Project Snapshot Client BAM Nuttall Ltd Sector Aviation / Construction Location Heathrow Airport Tunnels, London Services Picote concrete removal, CCTV drain surveying, high-pressure jetting Duration 1 month Challenge Hardened concrete blockages in live airport tunnel drainage, excavation impossible Overview When BAM Nuttall’s drainage investigation at Heathrow Airport uncovered hardened concrete blocking the tunnel drainage system,...Continue reading

Tree Root Removal Services for Storm Group

Sector: Public (Council owned day care)Client: Storm GroupProject Location: Lion and Hogarth Centre, BrentwoodDuration of project: 3 weeksLondon Drainage Facilities were approached by Storm Group to offer vital support for their project at the Lion and Hogarth Centre in Brentwood.ChallengeThe Lion and Hogarth Centre is a council-owned day centre for older people, providing care and...Continue reading