New Drainage Installation for Lower Ground Office Building in the UK

Drainage contractors near me London

Location: 28 Bolton St, London, W1 8BP

Project Dates: 1st July 2024 to 5th July 2024

Project Overview:

This project entailed the installation of a new drainage system for a lower ground office building situated in central London. The three-story building has a total floor area of approximately 6,000 square meters. The lower ground floor, currently unused, was prepared for the new drainage installation.

Challenges Faced Throughout the Project

The primary challenge for the excavation team, led by Ricci Ince, was to collaborate with the building inspector to install a drainage system capable of handling the high volume of wastewater produced by the offices on the upper floors.

Design and Installation by MWA Ltd & London Drainage Facilities Ltd

A team of experienced engineers spearheaded the design of the drainage system, which included the following key elements:

  • Foul Sewer Connection: This involves connecting the building to the main sewer line to ensure safe and efficient wastewater disposal.
  • New Showers: The Installation of shower drainage systems, ready for the second fix.
  • Surface Water Drainage: Designing a system to collect and manage stormwater runoff from the rooftop and surrounding areas.
  • Drainage Gullies: Reconnecting gullies to new 100mm combined drainage runs.

Key Components Involved

Drainage contractors near London

  • Foul Sewer Connection: DN100 PVC pipe
  • Osma DN100 PVC
  • Seal Recessed Manhole Cover & Frame (700mm x 600mm)
  • Surface Water Drainage: Sullage pipes with combined sewer connections
  • High Strength Concrete (40N)

Benefits of the Drainage System

The newly installed drainage system offers several advantages, including:

  • Efficient removal of excess water from the property, reducing the risk of flooding and water contamination.
  • Use of Osma’s Foul Water Drainage Systems, made from PVCu, providing strength, durability and ease of installation.

Outcome of The Project

The successful installation of the drainage system at this lower ground office building in London illustrates how meticulous planning, design and installation can overcome complex challenges. The system now ensures a reliable and efficient means of managing both wastewater and surface water.

The project was delivered on time and within budget.

Glen Richards

Excavation Manager

Excavation and installation of new drainage system

Client Name: Mitchells & Butlers Project Location: The Navigation Inn, 4 Wharf Road, Enfield, EN3 4XX Duration of Project: 2 months Sector: Hospitality Service Provided: Excavation and installation of new drainage system Challenge: The Navigation Inn’s proximity to the River Lee makes it highly susceptible to flooding, particularly during periods of heavy rainfall. The surrounding...Continue reading

Plumbing Pipework Replacement and Drainage Clearance

Client Name: Mitchells & Butlers Project Location: The Globe, 83 Moorgate, London EC2M 6SA Duration of Project: 1 day (Sunday) Sector: Hospitality Service Provided: Plumbing pipework replacement and drainage clearance   Challenge: The pipework serving the upstairs toilets was located within a ceiling void, making it completely inaccessible. Over time, the system had developed severe...Continue reading

Rehabilitation of Underslab Drainage System at Amersham Place

Client Overview: Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business. Background: The underslab drainage system at the Amersham Place facility required urgent attention due to...Continue reading

Lewisham Park Towers

Project Overview: Lewisham Park Towers is undergoing a comprehensive regeneration project aimed at enhancing the infrastructure and living conditions within the site. The project encompasses three towers, involving the complete replacement of exterior cladding, internal refurbishments of kitchens and bathrooms, and the relocation of soil stacks. The scope of work also includes the installation of...Continue reading

Repair Work to Sheerness Dockyard Church on behalf of Coniston Ltd

Sector: Construction Client: Coniston Ltd Project Location: Sheerness Dockyard Church Duration of project: 1 month London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent. Challenge The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the...Continue reading

Tanker and Wet Vac Services To Clear House of Commons Flood

Sector: Facilities Management Client: House of Commons Project Location: House of Commons, Palace of Westminster Duration of project: 1 week London Drainage Facilities responded to a flash flooding emergency at the House of Commons, following a prolonged stretch of downpours and storms. We provided tanker and wet vacs services to clear the flood and restore this high-profile...Continue reading

Picote Concrete Removal for BAM Nuttall Ltd at Heathrow Airport

Sector: Commercial Client: BAM Nuttall Ltd Project Location: Heathrow Airport Tunnels Duration of project: 1 month London Drainage Facilities were delighted to win the tender for a ground-breaking project at Heathrow Airport. Our client, BAM Nuttall Ltd, had been working there since 2014, upgrading the main tunnel into the Heathrow central terminal area. The client...Continue reading

Tree Root Removal Services for Storm Group

Sector: Public (Council owned day care)Client: Storm GroupProject Location: Lion and Hogarth Centre, BrentwoodDuration of project: 3 weeksLondon Drainage Facilities were approached by Storm Group to offer vital support for their project at the Lion and Hogarth Centre in Brentwood.ChallengeThe Lion and Hogarth Centre is a council-owned day centre for older people, providing care and...Continue reading