Client Name: Mitchells & Butlers Project Location: The Navigation Inn, 4 Wharf Road, Enfield, EN3 4XX Duration of Project: 2 months Sector: Hospitality Service Provided: Excavation and installation of new drainage system Challenge: The Navigation Inn’s proximity to the River Lee makes it highly susceptible to flooding, particularly during periods of heavy rainfall. The surrounding...Continue reading→
Repair Work to Sheerness Dockyard Church on behalf of Coniston Ltd

Sector: Construction
Client: Coniston Ltd
Project Location: Sheerness Dockyard Church
Duration of project: 1 month
London Drainage Facilities were approached by Coniston Ltd, who are contractors on the largescale Sheerness Dockyard Church renovation at Sheppey, Kent.
Challenge
The original Sheerness Dockyard Church was badly damaged by fire back in 2001. The building stands at the entrance to the former Royal Dockyard on the Isle of Sheppey in Kent. To support young people and new businesses in Sheppey, the Dockyard church project aims to restore Sheerness back to its former glory.
This is an enormous project, and the church is currently one of the most important buildings at risk in the south east of England. As a result, the project received a £4.2 million grant from the National Lottery Heritage Fund in 2019. From November 2020, an 18-month restoration project began to save the church.

As part of this extensive project, the construction company Coniston Ltd approached London Drainage Facilities to assist with repairing the drainage system in and around this historic building.
Solution
Before we could begin to provide drainage solutions, we required CCTV for full surveillance of the area we needed to repair – for this stage of the project, we used a CCTV crawler unit. This type of drain surveying technology allowed us to capture large diameter pipework of up to 900mm which isn’t possible with smaller solutions. Once in place, our technical team reviewed the footage to determine the most effective repair option available.
In this case, we used high pressure water jetting to clear out excess debris and remove the drainage blockages using a tanker. Unfortunately, our work uncovered issues with the lining of the drainage systems which were causing problems with its structural integrity. Therefore, we also carried out extensive resin patching and lining repairs to fix 120 metres of scaled and defective drainage.
This type of liner traverses around bends so it is mapped to the exact contours of the original pipe. Once the liner is in position, the resin sets which effectively bonds the liner to the pipe walls. Any previous fractures or open joints are entirely sealed – this improves the strength of the pipe and prevents unpleasant smells from leaking through cracks in the pipes. Critically, this solution also stops water from leaking into the surrounding ground.

As part of the liner repair task, our team worked efficiently in confined spaces to get the project completed and drainage restored in this historic building.

Get in touch to find out more about our services
London Drainage Facilities are available to work on any type of construction or restoration project. Since 2006, we have provided a wide range of emergency drain repair, cleaning and maintenance services throughout London and the southeast.
To learn more about our services, please contact us today on 020 8226 4675 to obtain a quote for emergency or planned works.
Plumbing Pipework Replacement and Drainage Clearance
Client Name: Mitchells & Butlers Project Location: The Globe, 83 Moorgate, London EC2M 6SA Duration of Project: 1 day (Sunday) Sector: Hospitality Service Provided: Plumbing pipework replacement and drainage clearance Challenge: The pipework serving the upstairs toilets was located within a ceiling void, making it completely inaccessible. Over time, the system had developed severe...Continue reading→
New Drainage Installation for Lower Ground Office Building in the UK
Location: 28 Bolton St, London, W1 8BP Project Dates: 1st July 2024 to 5th July 2024 Project Overview: This project entailed the installation of a new drainage system for a lower ground office building situated in central London. The three-story building has a total floor area of approximately 6,000 square meters. The lower ground floor,...Continue reading→
Rehabilitation of Underslab Drainage System at Amersham Place
Client Overview: Global Life Sciences Solutions Operations UK Ltd. is a prominent company operating in the life sciences sector. They own a facility located at Amersham Place, Little Chalfont HP7 9NA, where they conduct various operations critical to their business. Background: The underslab drainage system at the Amersham Place facility required urgent attention due to...Continue reading→
Lewisham Park Towers
Project Overview: Lewisham Park Towers is undergoing a comprehensive regeneration project aimed at enhancing the infrastructure and living conditions within the site. The project encompasses three towers, involving the complete replacement of exterior cladding, internal refurbishments of kitchens and bathrooms, and the relocation of soil stacks. The scope of work also includes the installation of...Continue reading→
Tanker and Wet Vac Services To Clear House of Commons Flood
Sector: Facilities Management Client: House of Commons Project Location: House of Commons, Palace of Westminster Duration of project: 1 week London Drainage Facilities responded to a flash flooding emergency at the House of Commons, following a prolonged stretch of downpours and storms. We provided tanker and wet vacs services to clear the flood and restore this high-profile...Continue reading→
Tanker and Wet Vac Services to Combat Flash Flooding at Newham General Hospital
Sector: Facilities Management Client: KRH Contracts Ltd Project Location: Newham General Hospital, Glen Road, London, E13 8RU Duration of project: 1 night When extreme weather hits the UK, this can be damaging and chaotic for public services. London Drainage Facilities were contacted after Newham General Hospital in East London was forced to close its busy A&E department due...Continue reading→
Picote Concrete Removal for BAM Nuttall Ltd at Heathrow Airport
Sector: Commercial Client: BAM Nuttall Ltd Project Location: Heathrow Airport Tunnels Duration of project: 1 month London Drainage Facilities were delighted to win the tender for a ground-breaking project at Heathrow Airport. Our client, BAM Nuttall Ltd, had been working there since 2014, upgrading the main tunnel into the Heathrow central terminal area. The client...Continue reading→
Tree Root Removal Services for Storm Group
Sector: Public (Council owned day care)Client: Storm GroupProject Location: Lion and Hogarth Centre, BrentwoodDuration of project: 3 weeksLondon Drainage Facilities were approached by Storm Group to offer vital support for their project at the Lion and Hogarth Centre in Brentwood.ChallengeThe Lion and Hogarth Centre is a council-owned day centre for older people, providing care and...Continue reading→